Shakes Solar Field

Solar energy field survey project in Carrizo Springs, TX.

Crossroads Bridge Replacement

This project consist of the replacement of the North and South bound bridges on I-25 at Crossroads Blvd. in Loveland Colorado.

North Metro Rail Line

The North Metro Rail Line project in Denver, Colorado.

Fremont County Old Highway 789 Realignment

Provide the survey and alignment design for the proposed realignment of Old Highway 789.

BLM Fortification Slope Slide Area

Provide the topographic survey data for a landslide area adjacent to a remote BLM road west of Gillette, WY.

Peirotto Drop Structure Documentation

Survey a collapsed irrigation diversion and control structure on Bitter Creek to provide an overview of the state of the structure and the extent of the surrounding scour and erosion.

Denver Light Rail Corridor Survey

Construction surveying services for construction on a 5-mile light railway transit corridor through a suburban and industrial area of Denver.

Pleasant Valley Road Realignment

6.1-mile corridor topographic survey of the Pleasant Valley road construction & realignment project.

2013 Road Extension

Civil design, construction management and surveying of over a mile of new arterial roadways and the upgrade of a concrete intersection with a traffic signal.

Lucy Estates Subdivision

Modeled the water distribution system and storm runoff and detention systems for this development.